The first concrete layer to the 100mm position, seting rail, then the second placement in the horizontal plane.
Seting the rail, adjust the level in the existing on the ground, and then pouring a concrete.
In the existing floor cutting 500mm wide, 100mm deep groove, and then seting rail.